================//=================
================//=================
![](https://shastalivingstreets.org/wp-content/uploads/2021/08/273-crop.png)
================//=================
![](https://shastalivingstreets.org/wp-content/uploads/2021/03/DtoD-1024x683.png)
================//=================
![](https://shastalivingstreets.org/wp-content/uploads/2020/12/Screen-Shot-2020-12-30-at-1.15.23-PM-1024x765.png)
A 50 mile transportation corridor connecting towns
Wide paths for riding side by side and passing comfortably
Separate spaces for walking and riding
For: Pedestrians – Bicyclists – Low-speed electric vehicles
Not the future anymore.
Low-speed electric = 20 mph or less
#lowstressbikeway – CLICK PHOTO FOR LINK TO STORY –